For Data Centers

A medium voltage power conversion platform for any data center campus use case.

Natively designed
to work with

The Challenge

Data center builders need new power conversion solutions that maximize tokens-per-watt and transform their campuses into grid resources.

Heron Link is a 5 megawatt medium-voltage power conversion system for every data center use case, with no MV transformers required. It supports direct MV AC to native 800 VDC rack power conversion, MV UPS, and E-STATCOM applications.

The result: smaller footprint, higher efficiency, and scalable solutions for your next grid-friendly data center campus.

Design your next data center campus as a grid asset.

Three grid-friendly campus designs that help developers meet emerging grid requirements for large loads, curtail when requested, and convert power efficiently to maximize the interconnection.

Three power solutions for
AI factories

Heron Link + SuperBBU
Heron Link MV UPS
Heron Link E-STATCOM

A skidded Heron Link with a high C-rate battery supports direct MV AC to native 800 VDC rack power conversion, stabilizing ripple and eliminating layers of legacy equipment. Compatible with NVIDIA’s Kyber roadmap for next-generation racks.

Power:
4.2 MW
DC Interface:
40 protected 800 VDC outputs
Worst-case MV AC ripple
<1%
Full Load Holdup:
60 seconds
MV AC-to-rack Efficiency
98.5%
Read more about the benefits of Heron Link + SuperBBU in our 800 VDC Blueprint.
↗

Key Benefits

A single block features two Heron Links back-to-back with flexible duration BESS for grid-load de-coupling, ramp-rate control, and fault ride-through. Meets NOGRR 282 and NERC requirements. Scalable to gigawatt campuses.

Read more about the benefits of Heron MV UPS in a Heron Campus.
↗
Power:
5 MW per block
AC Interface:
34.5 kV
BESS Duration:
5 min, 1 hour, 2 hour
Series Efficiency (AC-to-AC):
97%
Footprint Density:
250 MW / acre

Key Benefits

A Heron Link skidded with energy storage to deliver reactive power, active power injection, inertial response, and power quality support. It stabilizes weak grids and helps data center campuses get more usable capacity from their interconnection.

Power:
5.6 MVAr per block
AC Interface:
34.5 kV
Inertia:
5 seconds
CAPEX Savings
50%
Footprint Density
500 MVAr / acre
Read more about the benefits of Heron E-STATCOM in a Heron Campus.
↗

Key Benefits

Design your next project with Heron Link