For Utility-Scale Storage
An integrated power conversion platform for next-generation energy storage projects.
Contact our TeamThe Challenge

Heron Link is a modular, medium-voltage power conversion system purpose-built for utility-scale storage. It replaces the low-voltage inverters and step-up transformers common in today’s BESS deployments.
Designed for today’s evolving grid requirements, it delivers superior performance, lower lifetime cost of ownership, and grid-forming controls – all with a domestic manufacturing base.
Heron Link gives integrators and developers an open, configurable DC block BESS PCS that unlocks 6% NPV uplift at the project-level.
Key Benefits
98.6% DC-to-MV conversion efficiency
No temperature-driven derating up to 50 C
10x lower nighttime consumption than conventional transformers
N+2 redundancy allows cabinet to remain operational through cell failures
Power cells can be field-serviced in 30 minutes, not weeks
Engineered for durability with automated assembly and automotive-grade components
HeronCare LTSA covers 20 years of parts, labor and monitoring
Predictive analytics and scheduling algorithms that maximize service tasks per truck roll
40 GW of U.S. manufacturing capacity from Heron’s Factory One in Morgan Hill, CA
North America-centric supply chain that helps projects qualify for tax incentives
DC container-agnostic with standard interfaces
Compatible across chemistries, including LFP, NMC, and emerging chemistries
Grid-forming controls to support voltage and frequency regulation, blackstart, ride-through and harmonic damping
Extensible control layer that adapts to evolving grid standards
Integrate Heron Link with any DC BESS container to design a high-performance AC power block
Optimized footprint and clearances delivers 30% more MW per acre.
MVT and PCS clearances drive larger layouts and higher EPC costs.
We partner with leading BESS OEMs to deliver seamless DC integrations.
Read more about our announced partnership with LG Energy Solution Vertech below.
Read Press Release